Installation and Servces

INSTALLATION GUIDE

AQUApipe Installation guidelines:

a)

Before installation and debugging, please be sure to study the relevant installation manual, and strictly comply with the provisions of the installation manual. If you don't operate in accordance with the installation manuals, you will be responsible for all adverse consequences.

b)

Before installation, it is necessary to ensure the conditions for pipeline installation; to ensure that you are familiar with the structure of the building, and to specify plans and countermeasures according to its characteristics; to ensure that pipes and fittings meet standards and to remove dirt or impurities; to ensure that the tools are ready, the installers are professionally trained and familiar with the operations.

c)

During the installation, we must pay attention to the installation points mentioned in the installation manual, and strictly follow the steps, safely and orderly, meanwhile during the laying process of the pipeline, we should meet the requirements of laying conditions.

d)

After installation, the pipeline system must be subjected to pressure test, the process of test must comply with the installation manual. Pay attention, in the pressure test of drinking water pipelines, the quality of the test water must meet the requirements of the current local national standard 

e)

After completion of the pipeline system, it is necessary to check one by one according to the items specified in the installation manual before acceptance, make a uniform file and keep it properly.


Installation Reference Videos